Thursday, April 29, 2010

Production Week Starts!!

My floor plans are done in the design sense. I am putting them into Revit to show present them. I don't think at this point I will be doing a complete Revit model. I still need to figure out how I am going to graphically present all of my information. A lot to do in the next week, but hoping for a clean presentation.

Tuesday, April 27, 2010

Sunday, April 25, 2010

On the way home from Milwaukee and Chicago... Amazing time and amazing architecture... Now back to studio to finish this project up.

Saturday, April 17, 2010



I have been working with floor plans over and over again getting egress, flow, accessibility, and privacy to work all together. I think that I have it all figured it out and now I have debated on whether to put it into Revit or not. I have my sketch up model still going, so now I just need to figure out what I am going to do for finals.

Sunday, April 11, 2010

Sections and Elevations...





Red - Work Space

Blue - Living Space

Yellow - Mutual Space

Green - Vertical Circulation

Spatial Organization...



From top to bottom... floor 3,2,1

Thursday, April 8, 2010




The newest form that I have created... I was concerned about the neighboring building and the light that would be blocked from my previous sketches, so I went to this which would allow more light in through the west.

4-7-10

Working on the Multi-Use Lofts... Playing with individual separation within one. Thinking about concrete and how the sustainability of concrete can go along way.

Wednesday, April 7, 2010

Post Easter Break

I am getting back from break and starting to get back in the groove. Progressing forward...